Welcome to NewPLC!

Email

sales@bid-procurement.com

WhatsApp

+8613950166376

Yokogawa CP461-50 S1 Processor Module Unbelievable Prices!

Yokogawa CP461-50 S1 Processor Module Unbelievable Prices!

Release time:2025-08-15

Views:141

Payment Methods:T/T, PayPal, Western Union

Condition:New & In Stock

Shipping Port:Xiamen, China

Warranty:1 Year

Lead Time:1-3 Working Days

Certificate:COO

Courier partners:DHL, UPS, TNT, FedEx and EMS.

Business hours:7*24

Send Inquiry
Description
FAQ
Products Description
Yokogawa CP461-50 S1 Processor Module Unbelievable Prices!
Yokogawa CP461-50 S1 Processor Module Unbelievable Prices!
Yokogawa CP461-50 S1 Processor Module Unbelievable Prices!
Yokogawa CP461-50 S1 Processor Module Unbelievable Prices!
Company Information
E-mail sales@bid-procurement.com
Mobile +8613950166376
Whatsapp +8613950166376
WeChat 13950166376

Manufacturer:Yokogawa

Product Number:CP461-50 S1

Product Type:Processor Module

Origin:Japan

Dimensions:32.8 x 149 x 199.5 mm

Weight:0.7 kg


FAQ
Click to rate this post!
[Total: 0 Average: 0]

FAQ

Q1: What is the purpose of the CP461-50 S1 in the CENTUM VP system architecture?
A1: The CP461-50 S1 acts as the processor module within the Field Control Unit (FCU), executing control functions and managing communication with I/O modules and Vnet/IP networks.

Q2: How is redundancy achieved using the CP461-50 S1 module?
A2: Redundancy is configured by installing two identical CP461 modules in a dual-redundant configuration, ensuring continued operation in the event of a failure in one module.

Q3: What is the maximum number of node units that can be connected to a CP461-equipped FCU?
A3: A maximum of 13 ESB or Optical ESB Bus Node Units can be connected to the FCU where the CP461-50 S1 module is installed.

Q4: How does the CP461-50 S1 maintain memory data during power outages?
A4: It features battery backup that can retain main memory contents for up to 72 hours, with a minimum battery recharge time of 48 hours.

Q5: Can the CP461 module be replaced with the CP471 by end users?
A5: No, replacement from CP461 to CP471 is not permitted for end users and must be performed by authorized Yokogawa service personnel.

Q6: What software is required for operation with the CP461 module?
A6: The CP461 requires a dedicated license such as LFS1700 for control function use with AFV30/AFV40 units. It is compatible with CENTUM VP R6.01 or later.

Q7: What are the environmental or cabinet requirements for installing the CP461 module?
A7: The unit must be installed in a grounded metallic cabinet to meet safety and EMC standards, especially when configured with explosion protection options.

Q8: Which network communication standard does the CP461-50 S1 support?
A8: It supports dual-redundant Vnet/IP communication, ensuring high reliability and fast data exchange in process control networks.


Tags

Packing & Delivery

We will use wear-resistant cartons to seal the boxes, and take photos for your confirmation before sealing. We will pack the boxes only after confirmation.

For express delivery, we will use DHL, UPS, TNT, FedEx and EMS.

Please rest assured that we have a deep cooperation with express delivery companies and can ensure that your goods are delivered to you in good condition.


Leave Your Message


Leave a message