Welcome to NewPLC!

Email

sales@bid-procurement.com

WhatsApp

+8613950166376

Woodward 9907-029 SPM-A Synchroniseur

Woodward 9907-029 SPM-A Synchroniseur

Release time:2025-11-21

Views:105

Payment Methods:T/T, PayPal, Western Union

Condition:New & In Stock

Shipping Port:Xiamen, China

Warranty:1 Year

Lead Time:1-3 Working Days

Certificate:COO

Courier partners:DHL, UPS, TNT, FedEx and EMS.

Business hours:7*24

Send Inquiry
Description
FAQ
Products Description
Woodward 9907-029 SPM-A Synchroniseur
Woodward 9907-029 SPM-A Synchroniseur
Woodward 9907-029 SPM-A Synchroniseur
Woodward 9907-029 SPM-A Synchroniseur
Company Information
E-mail sales@bid-procurement.com
Mobile +8613950166376
Whatsapp +8613950166376
WeChat 13950166376

Manufacturer:Woodward

Product Number:9907-029

Product Type:SPM-A Synchroniseur

Origin:USA

Dimensions:120 x 150 x 60 mm

Weight:1.2 kg


FAQ
Click to rate this post!
[Total: 0 Average: 0]

FAQ

1. What is the primary role of the 9907-029 SPM-A Synchroniseur?
It ensures safe and precise synchronization of generators to the grid or bus by matching phase, voltage, and frequency before connection.

2. How does the device detect phase or voltage mismatches?
It continuously measures incoming generator signals and compares them to the bus parameters, triggering alarms or control actions when mismatches occur.

3. What protections are included to prevent equipment damage?
It includes overvoltage, undervoltage, overfrequency, and phase mismatch detection to safeguard both the generator and the grid.

4. Can it operate automatically without manual intervention?
Yes. The SPM-A performs automatic synchronization once configured, reducing operator workload and minimizing human error.

5. How is synchronization status monitored?
Real-time voltage, frequency, and phase difference are displayed, often via LEDs or connected plant monitoring systems, allowing operators to verify readiness.

6. What should be checked if synchronization fails?
Inspect generator output, confirm correct connection of voltage and frequency signals, and ensure breaker and control interfaces are functional.

7. Is the synchronizer suitable for high-vibration environments like turbine rooms?
Yes. It is designed to withstand vibration and temperature ranges typical in industrial and power generation environments.

8. How is installation typically performed?
The unit is mounted in a control panel or rack, wired to generator outputs, bus connections, and optionally integrated with the plant control system.

9. Can it synchronize multiple types of generators?
Yes. It is compatible with various synchronous generators, provided the input voltage and frequency range fall within specification.

10. What maintenance is recommended for reliable long-term operation?
Regular inspection of wiring, verification of input signal integrity, and functional checks of LEDs and alarms ensure the synchronizer operates correctly over time.


Tags

Packing & Delivery

We will use wear-resistant cartons to seal the boxes, and take photos for your confirmation before sealing. We will pack the boxes only after confirmation.

For express delivery, we will use DHL, UPS, TNT, FedEx and EMS.

Please rest assured that we have a deep cooperation with express delivery companies and can ensure that your goods are delivered to you in good condition.


Leave Your Message


Leave a message