Welcome to NewPLC!

Allen Bradley 150-F85NBD Soft Starter

Allen Bradley 150-F85NBD Soft Starter

Release time:2026-08-04

Views:15

Payment Methods:T/T, PayPal, Western Union

Condition:New & In Stock

Shipping Port:Xiamen, China

Warranty:1 Year

Lead Time:1-3 Working Days

Certificate:COO

Courier partners:DHL, UPS, TNT, FedEx and EMS.

Business hours:7*24

Send Inquiry
Description
FAQ
Products Description
Allen Bradley 150-F85NBD Soft Starter
Allen Bradley 150-F85NBD Soft Starter
Allen Bradley 150-F85NBD Soft Starter
Allen Bradley 150-F85NBD Soft Starter
Company Information
E-mail [email protected]
Mobile +8613950166376
Whatsapp +8613950166376
WeChat 13950166376

Manufacturer:Allen Bradley

Product Number:150-F85NBD

Product Type:Soft Starter

Origin:USA

Dimensions:150 × 321 × 203 mm

Weight:5.7 kg


FAQ
Click to rate this post!
[Total: 0 Average: 0]

FAQ

Q1: What is the Allen-Bradley 150-F85NBD used for?
A: The 150-F85NBD is used for soft starting and stopping of three-phase motors. It reduces mechanical stress and electrical inrush current during motor startup.

Q2: Which product family does the 150-F85NBD belong to?
A: It belongs to the Allen-Bradley SMC Flex Solid-State Controller family.

Q3: What motor power range does the 150-F85NBD support?
A: The controller supports motors rated approximately 15–60 HP at 460 VAC with an 85 A controller rating.

Q4: What input voltage is required for the 150-F85NBD?
A: The unit operates with a 200–480 VAC three-phase power supply and requires a 100–240 VAC control voltage.

Q5: Does the 150-F85NBD include motor protection functions?
A: Yes. It includes integrated electronic motor overload protection, fault monitoring, and diagnostic functions to improve motor system reliability.

Q6: What are the dimensions and weight of the 150-F85NBD?
A: The approximate dimensions are 150 × 321 × 203 mm, and the weight is approximately 5.7 kg.

Q7: Does the 150-F85NBD have an internal bypass?
A: Yes. The SMC Flex controller includes an internal bypass design, allowing the motor to run efficiently after the starting process is completed.

Q8: What should be checked before installing the 150-F85NBD?
A: Verify the motor full-load current, supply voltage, control voltage, wiring configuration, protection settings, and mounting requirements before installation. Ensure all power sources are disconnected before maintenance.


Tags

Packing & Delivery

We will use wear-resistant cartons to seal the boxes, and take photos for your confirmation before sealing. We will pack the boxes only after confirmation.

For express delivery, we will use DHL, UPS, TNT, FedEx and EMS.

Please rest assured that we have a deep cooperation with express delivery companies and can ensure that your goods are delivered to you in good condition.


Leave Your Message


Leave a message