Products Description




| Company Information | |||
| [email protected] | |||
| Mobile | +8613950166376 | ||
| +8613950166376 | |||
| 13950166376 |
Technical Specifications
| Parameter | Specification |
|---|---|
| Model | GE DS200TCTEG1ABA |
| Product Type | TC2000 Trip Module |
| System Series | GE Mark V Control System |
| Primary Function | Turbine trip and protection logic processing |
| Control Scope | Latching and interlock management |
| Input Type | Discrete trip contacts and logic inputs |
| Output Type | Trip relay drive outputs |
| Response Type | Real-time hardware-based logic |
| Operating Voltage | Supplied from Mark V backplane |
| Communication | Backplane data exchange with control processor |
| Diagnostic Features | Board status LEDs and system alarms |
| Redundancy Support | Designed for use in protected configurations |
| Mounting | Control cabinet / rack installation |
| Connector Type | Multi-pin edge connectors |
| Environmental Rating | Industrial control environment |
| Dimensions (W × H × D) | 200 × 120 × 35 mm |
| Weight | 0.82 kg |
FAQ
FAQ
Q1: What is the main function of the DS200TCTEG1ABA?
A1: It processes turbine trip logic and ensures safe shutdown when abnormal conditions occur.
Q2: Does this module directly control the trip solenoids?
A2: It provides the logic and output drive signals that interface with downstream trip devices.
Q3: Can this board operate independently from the main controller?
A3: No, it works as part of the Mark V system architecture and depends on the control processor.
Q4: Is programming required for this module?
A4: Trip logic is defined at system level; the board itself does not require field programming.
Q5: How does the board indicate a fault condition?
A5: Through onboard indicators and system alarms communicated to the control processor.
Q6: Can it be hot-swapped during operation?
A6: No, power should be isolated before installing or removing the module.
Q7: Is it used in both gas and steam turbine systems?
A7: Yes, it is applied in various turbine control environments where Mark V is used.
Q8: What should be checked if nuisance trips occur?
A8: Verify field wiring, input signals, grounding quality, and power stability.
Tags
Packing & Delivery
We will use wear-resistant cartons to seal the boxes, and take photos for your confirmation before sealing. We will pack the boxes only after confirmation.
For express delivery, we will use DHL, UPS, TNT, FedEx and EMS.
Please rest assured that we have a deep cooperation with express delivery companies and can ensure that your goods are delivered to you in good condition.
