Welcome to NewPLC!

Email

sales@bid-procurement.com

WhatsApp

+8613950166376

GE DS200PTBAG1BBA Mark V Termination Board

GE DS200PTBAG1BBA Mark V Termination Board

Release time:2025-12-02

Views:88

Payment Methods:T/T, PayPal, Western Union

Condition:New & In Stock

Shipping Port:Xiamen, China

Warranty:1 Year

Lead Time:1-3 Working Days

Certificate:COO

Courier partners:DHL, UPS, TNT, FedEx and EMS.

Business hours:7*24

Send Inquiry
Description
FAQ
Products Description
GE DS200PTBAG1BBA Mark V Termination Board
GE DS200PTBAG1BBA Mark V Termination Board
GE DS200PTBAG1BBA Mark V Termination Board
GE DS200PTBAG1BBA Mark V Termination Board
Company Information
E-mail sales@bid-procurement.com
Mobile +8613950166376
Whatsapp +8613950166376
WeChat 13950166376

Manufacturer:GE

Product Number:DS200PTBAG1BBA

Product Type:Mark V Termination Board

Origin:USA

Dimensions:260 × 100 × 25 mm

Weight:0.39 kg


FAQ
Click to rate this post!
[Total: 0 Average: 0]

FAQ

Q1: What is the role of the DS200PTBAG1BBA in a Mark V system?
A1: It serves as the interface between field devices and the control system by terminating signals in an organized manner.

Q2: Can this board handle both analog and digital signals at the same time?
A2: Yes, it is designed to route and terminate mixed I/O types within one assembly.

Q3: Is special configuration required when replacing this board?
A3: No software configuration is typically required, but wiring should follow the original terminal layout exactly.

Q4: Does the board provide surge or noise protection?
A4: It relies on system grounding and cabinet design, with optional shielding support through terminal layout.

Q5: Can wiring be modified without affecting the control logic?
A5: Yes, the board only handles physical termination; logic is processed in the controller hardware.

Q6: Is it compatible with all Mark V panels?
A6: It is intended for specific Mark V panel designs and should be matched by part number.

Q7: Does this board include any active electronic components?
A7: No, it is primarily a passive termination assembly.

Q8: What is the main risk when installing a replacement board?
A8: Incorrect wire placement, which can lead to signal mismatch or control faults.


Tags

Packing & Delivery

We will use wear-resistant cartons to seal the boxes, and take photos for your confirmation before sealing. We will pack the boxes only after confirmation.

For express delivery, we will use DHL, UPS, TNT, FedEx and EMS.

Please rest assured that we have a deep cooperation with express delivery companies and can ensure that your goods are delivered to you in good condition.


Leave Your Message


Leave a message